Project overview
In 2023, CO-WIN partnered with China Tower to build three demonstration sites across distinctly challenging operating environments: an island, a plateau and a high-mountain location.
The program was designed to validate key performance characteristics, including tolerance of high temperatures and high-altitude operation. The sites were delivered in August 2023 and continue to operate stably.
On site



Three locations expose the systems to different temperature, altitude and access conditions.
The deployments verify performance requirements for high-temperature and high-altitude operation.