Back to projects
Hydrogen backup power equipment installed at a China Tower demonstration site

Telecom Base Stations & Equipment Rooms Backup Power

China Tower Multi-Climate Demonstration Sites

Three demonstration sites across island, plateau and high-mountain environments validate robust hydrogen backup performance.

Partner
China Tower
Sites
3 demonstration stations
Environments
Island, plateau and high mountain
Delivered
August 2023

Project overview

Proving dependable operation beyond conventional site conditions.

In 2023, CO-WIN partnered with China Tower to build three demonstration sites across distinctly challenging operating environments: an island, a plateau and a high-mountain location.

The program was designed to validate key performance characteristics, including tolerance of high temperatures and high-altitude operation. The sites were delivered in August 2023 and continue to operate stably.

01

Climate diversity

Three locations expose the systems to different temperature, altitude and access conditions.

02

Environmental validation

The deployments verify performance requirements for high-temperature and high-altitude operation.

03

Ongoing service

All demonstration sites remain in stable operation following their August 2023 delivery.

Need resilient power for remote and demanding locations?

Discuss a project